How long would it take to install appliances?
I need to disconnect and take out Appliances (oven, refrigerator, washer, dryer, dishwasher) then replace them with new ones. If I were to hire someone to do this for me how long would it take? Assuming I already have all of the new appliances.
250 bucks, 5 hours
Well the Fridge, washer and dryer won’t take much time as it should just be a take out the old, put in the new. The oven and dishwasher may take some time, but overall, everything shouldn’t take more than a day.
References :
Depending on what type of oven and refrigerator you have, it should take about 1-2 hours. If the installer has all the connection hoses, electrical cords, I can’t imagine it would be a very long process. If the ref. is a built-in (Sub-Zero for example), that could be a longer process. Is the oven a free standing range (not slide-in or drop-in)? Is it one guy or two doing the work? A plumber may have to be involved as well. Good luck!
References :
I am the source…kitchen designer for 20 years.
250 bucks, 5 hours
References :